F1 Kabataş-Taksim:
Railway projects and construction have recently been accelerated to integrate and modernize Istanbul’s urban public transport network. As part of these efforts, the Metropolitan Municipality has focused on Taksim-Kabatas Funicular Line to integrate maritime and rail-based transport, and succeeded in launching the system on 29 June 2006.
Stations:
Kabataş-Taksim
Operational Data:
- Opening Date: 29.06.2006
- Line Length: 594 m
- Number of Stations: 2
- Number of Cars: 4
- Trip Duration: 2.5 minutes
- Operational Hours: 06:15 / 00:00
- Daily Ridership: 30,000 passengers / day
- Number of Daily Trips: 195 trips per direction
- Frequency: 3 minutes during peak hours